CLIENT LIST PANCA WAHANA GROUP
NO | USER NAME | LOKASI USER | LIST PEKERJAAN | MULAI | SELESAI |
---|---|---|---|---|---|
1 | PT. RUHAAK PHALA INDUSTRY (LTD) | TANGERANG-BANTEN | Fabrikasi Stop log & Bar screen | November-07 | November-07 |
2 | PT. RUHAAK PHALA INDUSTRY (LTD) | TANGERANG-BANTEN | Fabrikasi Coal Dump truck | December-07 | December-07 |
3 | PT. BOUSTEAD MAXITHERM INDUSTRY | BEKASI-JABAR | Fit up & Welding Indirect heater (PV.028) | December-07 | December-07 |
4 | PT. BINTANG LESTARI PERSADA | JAKARTA | Installation Steam Piping at PT.SAMPOERNA Karawang | December-07 | December-07 |
5 | PT. GAPURA TEKINDO SAKTI | BEKASI-JABAR | 2 unit Engineering Modification MFO Boiler to Coal Boiler cap. 3 tons/hr | December-07 | February-08 |
6 | PT. PURNAMA TIRTATEX | BANDUNG-JABAR | Re-tube Furnace tube Hamada Boiler type DF 12-12 FBC | January-08 | January-08 |
7 | PT. RUHAAK PHALA INDUSTRY (LTD) | TANGERANG-BANTEN | Fabrikasi Truck Tank | January-08 | January-08 |
8 | PT. ZUG INDUSTRY | JAKARTA | Re-tube Furnace tube Hamada Boiler type DF 16-16 FBC | March-08 | March-08 |
9 | PT. ZUG INDUSTRY | JAKARTA | Supply Induced Draft Fan Impeller Hamada Boiler type DF 16-16 FBC | April-08 | April-08 |
10 | CV. TRIE FASHION | TANGERANG-BANTEN | Fabrication & Installation Modify Solar Boiler to Coal Boiler (Vertical Type) cap. 1 tons/hr | Mei 2008 | Mei 2008 |
11 | CV. MITRA AGRO LESTARI | JAKARTA | Supply Heat exchanger for drying coconut char coal | October-08 | October-08 |
12 | PT. ENGGAL SUBUR KERTAS | KUDUS-JATENG | Modify Chain grate Boiler to Fluidized Bed Combustion type DZL 20 | July-09 | August-09 |
13 | PT. ENGGAL SUBUR KERTAS | KUDUS-JATENG | Re-tube Furnace tube Hamada Boiler type DF 12-12 FBC | September-09 | September-09 |
14 | PT. BUANA SURYA TEKNINDO | TANGERANG-BANTEN | Re-tube Furnace tube Hamada Boiler type DF 16-16 FBC at PT LOC-Banten | January-10 | January-10 |
15 | CV. PURNAMA TIRTATEX | BANDUNG-JABAR | Engineering, Design & Installation Thermal Oil Heater 6.000.000 kcal/jam; type:QXL-600-FBC | March-10 | May-10 |
16 | PT. VONEX INDONESIA | BANDUNG-JABAR | Replacement Chimney coal boiler #2 | June-10 | June-10 |
17 | PT. VONEX INDONESIA | BANDUNG-JABAR | Replacement Chimney coal boiler #1 | July-10 | July-10 |
18 | PT. KAPURINDO SENTANA BAJA | CILEGON-BANTEN | Replacement Screw Conveyor | July-10 | July-10 |
19 | PT. MASTRADA | JAKARTA | EPC-Fluidized Bed Combustion Boiler kapasitas 15 ton/jam type DF 15-16 FBC at PT DSS | August-10 | February-11 |
20 | CV. PURNAMA TIRTATEX | BANDUNG-JABAR | Engineering, Design & Installation Steam Boiler kapasitas 12 ton/jam; type:DF12-12-FBC | November-11 | January-12 |
21 | PT. ORIENTAL TEXTILE | BANDUNG-JABAR | Retubing FBC Tube & Perbaikan Furnace Refractory Boiler Hamada DF12 | August-11 | August-11 |
22 | PT. MASTRADA | JAKARTA | EPC of Reverse Chain Grate Boiler kapasitas 50 ton/jam type: SHL50 -2.5/300 at PT CIWI KIMIA | April-12 | August-13 |
23 | PT. TEDCO AGRI MAKMUR | LAMPUNG | Design Fabrication & Supply Thermal oil Tube | April-13 | April-13 |
24 | PT. POWERTECH INDONESIA | JAKARTA | Supply 20 unit Air Damper | May-13 | May-13 |
25 | CV. PURNAMA TIRTATEX | BANDUNG-JABAR | Re-tube Furnace tube & Waterwall Tube Hamada Boiler type DF 12-13 FBC | August-13 | August-13 |
26 | PT. BUANA HIJAU ADITAMA | TANGERANG-BANTEN | Fabrikasi 4 unit Storage Tank Cap 100 T | September-13 | September-13 |
27 | CV. PURNAMA TIRTATEX | BANDUNG-JABAR | Replacement 2 unit Boiler Chimney | November-13 | November-13 |
28 | PT. KARLITA EMAS | BEKASI-JABAR | Supply 2 unit SUS 316 L (Food Grade) Screw Conveyor kap: 200 kg/menit | April-14 | August-14 |
29 | PT. KALIABANG | BEKASI-JABAR | Piping & Storage Tank Installation Bio Diesel Plan at PT Darmex Bekasi | April-14 | August-14 |
30 | PT. TIRTA FRESHINDO JAYA (Cimande) | BOGOR-JABAR | Overhole Boiler & Perbaikan Furnace Refractory Boiler Hamada DF12 | July-14 | July-14 |
31 | PT. MULYA MANDIRI SENTOSA | TANGERANG-BANTEN | Piping & Storage Tank Installation Chemical Plan at PT Inawan Chemtex Sukses Abadi - tangerang | August-14 | February-15 |
32 | PT. TIRTA FRESHINDO JAYA (Cimande) | BOGOR-JABAR | Supply & Perbaikan controller boiler Hamada DF 12 | October-14 | October-14 |
33 | PT. QINTANI | CIREBON-JABAR | Supply 8 Unit Storage Lube Tank Cap 25000 Liter for PT. Freport - Papua | April-15 | May-15 |
34 | PT. ORIENTAL TEXTILE | BANDUNG-JABAR | Retubing FBC Tube & Perbaikan Furnace Refractory Boiler Hamada DF12 | July-15 | July-15 |
35 | PT. ERA MULYA CITRA WARNA | BOGOR-JABAR | Supply SUS 304 Screw Conveyor kapasitas 1,5 M3/jam dan Feeding Silo | August-15 | August-15 |
36 | PT. BERLIAN PALUGADA PERKASA | CILEGON-BANTEN | Supply Grating & Tangga Platform | October-15 | October-15 |
37 | PT. NIPINDO BANGUN CIPTA | JAKARTA | Fabrikasi Bending Pipa 2.5” Sch 40 sebanyak 108 pcs | November-15 | November-15 |
38 | PT. MASTRADA | JAKARTA | Supply & Installasi Daerator Tank, installasi Boiler 5 T/H & piping | November-15 | December-15 |
39 | PT. KARSA SUMBER RAHARJA | BOGOR-JABAR | Supply Screw Conveyor& Modifikasi chut Silo, Crushher Support | December-15 | January-16 |
40 | PT. NIPINDO BANGUN CIPTA | JAKARTA | Fabrikasi Bending Pipa 2.5” Sch 40 | January-16 | January-16 |
41 | PT. ATMI | SOLO-JATENG | Supply 1 Unit Stainless Screw Conveyor Cap 2T/H panjang 4 Meter | March-16 | April-16 |
42 | PT. RIMBA PARTIKEL INDONESIA | SEMARANG-JATENG | Supply 2 Unit Heavy duty roller conveyor | April-16 | May-16 |
43 | PT HUNG-A INDONESIA | BEKASI-JABAR | Supply & installasi Chimney Dia 1,5 m x 27 m | April-16 | May-16 |
44 | PT. ATMI | SOLO-JATENG | Supply 1 Unit Mixing Screw Conveyor Cap 2T/H panjang 4 Meter | May-16 | June-16 |
45 | PT. DIAN SWASTIKA SENTOSA (DSS) | TANGERANG-BANTEN | Supply & Installasi Multicyclone for Boiler 25 T/H periode | May-16 | May-16 |
46 | PT. TIRTA FRESHINDO JAYA (Cimande) | BOGOR-JABAR | Supply & Overhole boiler Hamada DF 12 | June-16 | July-16 |
47 | PT. TIRTA FRESHINDO JAYA (Cimande) | BOGOR-JABAR | Supply & Overhole boiler Basuki cap 10 T/H | June-16 | July-16 |
48 | PT. MERINDO MAKMUR | TANGERANG-BANTEN | Supply Spare Part Piping Aerasi at PT Charon Pophan | July-16 | July-16 |
49 | PT HA TIRE | BEKASI-JABAR | Retubing water tube Boiler Cap 5 TPH | July-16 | August-16 |
50 | PT SOLID ENGINEERING | BEKASI-JABAR | Moification oultlet Ducting PLTU no 4 Tanjung Jati | August-16 | September-16 |
51 | PT HA TIRE | BEKASI-JABAR | Retubing water tube Boiler Cap 5 TPH ; Periode 02 | October-16 | October-16 |
52 | PT. GLOBAL SARANA INDONESIA | JAKARTA | Supply Offshore Equipment (Grapnel) | October-16 | October-16 |
53 | PT. PP PRECAST | JAKARTA | Supply & Installation Building Steel Structure | November-16 | December-16 |
54 | PT. CROMPTON PRIMA SWITCGEAR INDONESIA | SERANG-BANTEN | Installation Oil Heater & Piping Cap 500000 Kcal | December-16 | January-17 |
55 | PT. BERKAH BINA AMANAT | JAKARTA | Supply Bucket Conveyor & Fabrication Body Screw Conveyor | January-17 | January-17 |
56 | CEE DEE VACUM EQUIPMENT PVT.LTD | INDIA | Installation Autoclav System at PT CPSI - Serang Banten | January-17 | March-17 |
57 | PT. SYN TOBA GRAFIKA | TANGERANG-BANTEN | Suplly & overhaul Ducting boiler BASUKI 6 TPH | March-17 | March-17 |
58 | PT. LLOYD PHARMA INDONESIA | TANGERANG-BANTEN | Cerobong dan emisi check poit Material SUS 304 dia. 500 mm | March-17 | March-17 |
59 | PT. CARTENZ CIPTA SARANA | BEKASI-JABAR | Supply Screw Conveyor SS 304 | March-17 | March-17 |
60 | THERMAX LIMITED | INDIA | Installation Oil Heater & Cap 6.000.000 Kcal at PT Mulya Lestari Bandung | May-17 | June-17 |
61 | PT. TIRTA FRESHINDO JAYA (Cimande) | BOGOR-JABAR | Supply & Overhole boiler Hamada DF 12 | June-17 | June-17 |
62 | PT. TIRTA FRESHINDO JAYA (Cimande) | BOGOR-JABAR | Supply & Overhole boiler BASUKI 10 TPH | June-17 | June-17 |
63 | PT KWALRAM INDONESIA | BANDUNG-JABAR | Installation Efeeclean system boiler thermax 5 TPH | June-17 | June-17 |
64 | PT.SUNTORY GARUDA BAVERAGE (GARUDA FOOD GROUP) | SIDOARJO-JATIM | Supply & Overhole boiler TWA 10 TPH | June-17 | June-17 |
65 | PT. SYN TOBA GRAFIKA | TANGERANG-BANTEN | Suplly & overhaul Ducting boiler BASUKI 6 TPH | September-17 | September-17 |
66 | PT.JAYA KONSTRUKSI | JAKARTA | Supply Cerobong & Ducting AMP | October-17 | November-17 |
67 | CEE DEE VACUM EQUIPMENT PVT.LTD | INDIA | Installation Autoclav System at PT Bambang Jaya-Sidoarjo-Jatim | October-17 | December-17 |
68 | PT. MAXIMA PRO CORPORA | JAKARTA | Penggantian Cold Insulation, Injection Poly Uretane for Chiller Pipe Line at PT Angkasa Pura Tangerang | November-17 | February-18 |
69 | PT. SYN TOBA GRAFIKA | PURWAKARTA-JABAR | Supply Ducting & Dust Collector Boile Basuki 4 TPH | January-18 | February-18 |
70 | PT.SEBUKU BATUBAI COAL | JAKARTA | EPC - 2 Unit Storage tank kap 200 KL at PT Sebuku Kota Baru Kalsel | February-18 | May-18 |
71 | PT.JAYA KONSTRUKSI | JAKARTA | Rekondisi AMP Plan | April-18 | May-18 |
72 | PT. JAYA KONSTRUKSI | JAKARTA | Supply & Installation AMP Drayer Blade | April-18 | May-18 |
73 | PT. SYN TOBA GRAFIKA | PURWAKARTA-JABAR | Supply 4 Unit Roller trolly | May-18 | May-18 |
74 | PT. TIRTA FRESHINDO JAYA (Cianjur) | CIANJUR-JABAR | Supply & Installation Piping SUS 304 DW7 | October-18 | November-18 |
75 | PT. MULTI PRIMA USAHATAMA | JAKARTA | Supply 5 unit Augher silo Cap 10 m3 | Januari -19 | Maret - 19 |
76 | PT. WIRYA KRENINDO PERKASA | JAKARTA | Supply 4 unit Water Tank Cap 18 m3 | Januari-19 | Februari-19 |
77 | PT. MASTRADA | JAKARTA | Supply & Installasi Piping & ME Kichen Equipment | Maret-19 | Mei-19 |
78 | PT. PLASTIKATAMA TEKNOLOGI INDUSTRI | CIKARANG | Supply & Installasi SUS Exhaust Ducting | Maret-19 | April-19 |
79 | PT. TIRTA FRESINDO JAYA (CIHERANG) | BOGOR | Perbaikan Dapur Boiler Basuki kap 20TPH | Mei-19 | Mei-19 |
80 | PT. SUNTORY GARUDA BAVERAGE (GARUDA FOOD GROUP) | SIDOARJO-JATIM | Supply & Installasi Economizer Boiler Kapasitas 6 TPH | Mei-19 | Juni-19 |
81 | PT. SYN TOBA GRAFIKA- SADANG | CIKAMPEK-JABAR | Supply Boiler Equipment (cerobong&Ducting) Boiler kap 4 TPH | Mei-19 | Juni-19 |
82 | PT. TRI TEGUH MANUNGGAL SEJATI-PATI (GARUDA FOOD GROUP) | PATI-JATENG | Supply & Installasi Economizer Boiler Kapasitas 4 TPH | Agustus-19 | September-19 |
83 | PT. VOITH HYDRO INDONESIA | JAKARTA | Supply Turbin Equipment | Agustus-19 | Agustus-19 |
84 | PT. TIRTA FRESHINDO JAYA (Cianjur) | CIANJUR-JABAR | Supply & Installation Piping SUS 304 DW10, DW11, DW12 | February-20 | March-20 |
85 | PT. KWALRAM INDONESIA | BANDUNG-JABAR | Supply & Installation Piping & oil header | February-20 | March-20 |
86 | PT. MAYORA INDAH Tbk (JAYANTI) | TANGERANG-BANTEN | Supply & Installation Double jacketing Piping SUS 304 | February-20 | March-20 |
87 | PT. PEARL STAR INTERNASIONAL | DEPOK - JAWA BARAT | Retubing Boiler 2 TPH | March-20 | March-20 |
88 | PT. TIRTA FRESHINDO JAYA (Ciherang) | BOGOR-JABAR | Supply & Installation Belt conveyor Equipment | March-20 | March-20 |
89 | PT. TIRTA FRESHINDO JAYA (Cimande) | BOGOR-JABAR | Overhaul Boiler Hamada 10 TPH | March-20 | March-20 |
90 | PT. TIRTA FRESHINDO JAYA (PALEMBANG) | PALEMBANG-SUMSEL | Overhaul Boiler Basuki 4 TPH | March-20 | March-20 |
91 | PT. ARHA PERDANA ABADI | SIBOLGA-SUMUT | Supply & installation Fly sand system Piping PLTU Labuhan Angin-SIBOLGA | March-20 | June-20 |
92 | PT. TIRTA FRESHINDO JAYA (Makasar) | MAKASAR-SULSEL | Overhaul Boiler Basuki 4 TPH | April-20 | April-20 |
93 | PT. DEWI MAYANGMANIK | BOGOR-JABAR | Suply Frame Belt conveyor BW 1000 L=35 m | April-20 | April-20 |
94 | PT. SYN TOBA GRAFIKA | PURWAKARTA-JABAR | Supply Ducting & Multi cyclone Boiler 4 TPH | June-20 | July-20 |
95 | PT. ADHI TEKNO MANDIRI | BOGOR-JABAR | Suplly Screw Conveyor Dia 500 mm L = 7 Meter | August-20 | August-20 |
96 | PT. MAYORA INDAH Tbk (JAYANTI) | TANGERANG-BANTEN | Supply & Installation Agitaor Tank Biskuit Coklat | October-20 | November-20 |
97 | PT.SUNTORY GARUDA BAVERAGE (GARUDA FOOD GROUP) | SIDOARJO-JATIM | Overhaul Chimney Boiler | November-20 | November-20 |
98 | PT. INDO SUTECH SEJAHTERA | SEMARANG-JATENG | Overhaul & Linning D Massecuite Reciver at PT andalan Furnindo | October-20 | December-20 |
99 | PT.SUNTORY GARUDA BAVERAGE (GARUDA FOOD GROUP) | SIDOARJO-JATIM | Overhaul Silo Boiler Cangkang Sawit | December-20 | December-20 |
100 | PT. NESTLE INDONESIA | CIKARANG-JABAR | Supply Semless bending Pipe sus 304 | December-20 | December-20 |
101 | PT SOLID ENGINEERING | BEKASI-JABAR | Supply Piping Rubber linning | January-21 | January-21 |
102 | PT. TIRTA FRESHINDO JAYA (Cimande) | BOGOR-JABAR | Supply & Installation 4 unit Damper IDF Boiler Hamada 10 TPH | February-21 | March-21 |
103 | PT. TIRTA FRESHINDO JAYA (Cianjur) | CIANJUR-JABAR | Supply Piping SUS 304 DW13 | March-21 | March-21 |
104 | PT. TIRTA FRESHINDO JAYA (Cianjur) | CIANJUR-JABAR | Supply Piping SUS 304 DW14 | April-21 | April-21 |
105 | PT. WIKA INDUSTRI ENERGI | BOGOR-JABAR | Supply Water Tank Cap 3000 Ltr SUS 304 | April-21 | April-21 |
106 | PT. TIRTA FRESHINDO JAYA (PALEMBANG) | PALEMBANG-SUMSEL | supply pipa inbed Boiler Basuki 4 TPH | May-21 | May-21 |
107 | PT. PURNAMA TIRTATEX | BANDUNG-JABAR | Supply & installation Steam Doom Header | May-21 | June-21 |
108 | PT. KWALRAM INDONESIA | BANDUNG-JABAR | Supply & installation Relocated Oil header, Piping & Insulation | May-21 | May-21 |
109 | PT. INDO TECHNIC AGUNG PERKASA | DKI JAKARTA | Overhaul HRSG Boiler PT YAMAHA INDONESIA | June-21 | September-21 |
110 | PT. SARANA GLOBAL ONDONESIA | DKI JAKARTA | Supply Grapnell Equipment | August-21 | August-21 |
111 | PT. WIKA INDUSTRI ENERGI | BOGOR-JABAR | Supply 2 unit Water Tank Cap 1000 Ltr SUS 304 | August-21 | September-21 |
112 | PT. KARYA KITA JAYA | CIKAMPEK-JABAR | SHOE WASTE CRUSHING PLAN KAP 2,5 TPH X 2 UNIT | September-21 | December-21 |
113 | PT. POLYCHEMIE ASIA PASIFIC PERMAI | BOGOR-JABAR | Supply & installation Steam piping & Steam Header | September-21 | September-21 |
114 | PT. HEMIRAT UTAMA KARYA | BATAM-KEP RIAU | Supply 10,000 set Articulated Pipe | October-21 | December-21 |
115 | PT. SUNTORY GARUDA BAVERAGE (GARUDA FOOD GROUP) | SIDOARJO-JATIM | Supply & Installation Economizer Biomas Boiler 8 TPH | October-21 | November-21 |
116 | PT. ADHI TEKNO MANDIRI | BOGOR-JABAR | Suplly Screw set Conveyor Dia 500 mm L = 7 Meter | October-21 | November-21 |
117 | PT. SYN TOBA GRAFIKA | TANGERANG-BANTEN | Supply & Installation Chimney, Ducting & Scrubber Boiler Basuki 4 TPH | October-21 | November-21 |
118 | PT. JAYA KONSTRUKSI MANGGALA PRATAMA Tbk | TANGERANG-BANTEN | Perbaikan AMP Linhoff | November-21 | December-21 |
119 | PT. SYN TOBA GRAFIKA | PURWAKARTA-JABAR | Supply Ducting &Impeler IDF Boiler 4 TPH | January-22 | February-22 |
120 | PT. TIRTA FRESHINDO JAYA (Ciherang) | BOGOR-JABAR | Supply & InstallationTwin screw, Shaft IDF & Belt Conveyor | February-22 | March-22 |
121 | PT. TIRTA FRESHINDO JAYA (Pasuruan) | PASURUAN-JATIM | Supply & Installation Pipe inbed Tube Boiler Basuki 20TPH | April-22 | July-22 |
122 | PT. TIRTA FRESHINDO JAYA (Makasar) | MAKASAR-SULSEL | Overhaul Pipa inbed Boiler Basuki 4 TPH | April-20 | April-20 |
123 | PT. SUNTORY GARUDA BAVERAGE (GARUDA FOOD GROUP) | SIDOARJO-JATIM | Rekondisi Chimney Biomas Boiler 8 TPH | May-22 | May-22 |
124 | PT. JAYA KONSTRUKSI MANGGALA PRATAMA Tbk | TANGERANG-BANTEN | Perbaikan AMP SPECO | May-22 | June-22 |
125 | PT. HA TIRE | CIKARANG-JABAR | Rekondisi Chimney Boiler 4 TPH | May-22 | May-22 |
126 | PT. NAGAMASINDO BANGUN JAYA | DKI JAKARTA | Supply Chimney OD 1350 mm H 12 Mtr, & Tanks SUS304 2000 L | July-22 | August-22 |
127 | PT. TIRTA FRESHINDO JAYA (Palembang) | PALEMBANG-SUMSEL | Supply Pipa inbed Boiler Basuki 4 TPH | August-22 | August-22 |
128 | PT SOLID ENGINEERING | BEKASI-JABAR | Supply Spool Pipe DN 1100 L = 3 M | August-22 | August-22 |
129 | PT. INAWAN CHEMTEX SUKSES ABADI | TANGERANG-BANTEN | Supply & Installation Tank Cap 4000 L & Coil Heater SUS 304 | August-22 | August-22 |